TRADE NEWS
VR

BGA repair table SMT BGA chip repair steps are what?

December 08, 2022

Today, Xiaobian will focus on explaining SMT BGA chip repair steps. 1. Board baking preparation and related requirements before maintenance.

① According to the different exposure time, the boards are given different baking requirements. The exposure time of the boards: the processing month time on the bar code of the boards shall be the standard, and so on.

② Baking time, according to the following provisions for baking:

Exposure time ≤2 months more than 2 months

Bake time 10 hours 20 hours

The baking temperature is 105±5℃

③ Before drying the board, the repairman should remove the temperature-sensitive components, such as optical fiber and plastic, and bake them; Otherwise, the device will be damaged by heat. (4) For all boards, the BGA repair work must be completed within 10 hours after the board is removed after baking.

⑤ PCBA that cannot complete the BGA repair work within 10 hours should be placed in a drying oven for storage, otherwise it will easily lead to backwetting, and the backwetting PCBA will easily cause the PCBA bulge during welding.

BE MY FRIEND:

Check out my email address: dtf2009@dataifeng.cn

warning!  are you avoiding Professional BGA Repair Station Manufacturer mistakes?


#dataifeng    #BGA rework station    #manufacturer    #factory    #factorywork


Basic Information
  • Year Established
    --
  • Business Type
    --
  • Country / Region
    --
  • Main Industry
    --
  • Main Products
    --
  • Enterprise Legal Person
    --
  • Total Employees
    --
  • Annual Output Value
    --
  • Export Market
    --
  • Cooperated Customers
    --

Send your inquiry

Choose a different language
English
العربية
Deutsch
Español
italiano
한국어
русский
Esperanto
हिन्दी
bahasa Indonesia
Bahasa Melayu
ภาษาไทย
Tiếng Việt
Current language:English